Skip to content
SkimNews
SponsoredApplysparrowPaste a job link, get a resume written for that job.Try it free →
Energy

Ore Energy to Deploy 1 GWh Iron-Air Battery for Budget

Image from Electrek

The 30-Second Skim7 points

  • What happenedDutch long-duration storage startup Ore Energy has signed what it calls continental Europe's largest iron-air battery deal — 1 GWh with Dutch energy supplier Budget Thuis, starting with 400 MWh in 2028.
  • Key facts & numbersOre Energy announced a 1 GWh iron-air battery agreement with Dutch energy supplier Budget Thuis, described as the largest iron-air battery deal in continental Europe and the first such agreement with a European energy supplier, with the first 400 MWh phase slated for 2028 delivery Iron-air batteries can store electricity for up to 100 hours using iron, water, and air in modular 40-foot containers that daisy-chain for scale, trading the higher efficiency of lithium-ion for cheaper, simpler materials on a European supply chain Ore Energy completed a pilot with EDF in France between August and November 2025, which it says was Europe's first grid-connected iron-air long-duration storage pilot and demonstrated up to four days of storage under real-world utility conditions
  • What happens nextThe 4-day battery is finally landing with a real utility buyer, not just a pilot — and it's iron and air, not lithium. Cheap materials, ugly footprint, but Europe needs it.
  • Ore Energy announced a 1 GWh iron-air battery agreement with Dutch energy supplier Budget Thuis, described as the largest iron-air battery deal in continental Europe and the first such agreement with a European energy supplier, with the first 400 MWh phase slated for 2028 delivery
  • Iron-air batteries can store electricity for up to 100 hours using iron, water, and air in modular 40-foot containers that daisy-chain for scale, trading the higher efficiency of lithium-ion for cheaper, simpler materials on a European supply chain
  • Ore Energy completed a pilot with EDF in France between August and November 2025, which it says was Europe's first grid-connected iron-air long-duration storage pilot and demonstrated up to four days of storage under real-world utility conditions
  • Ore Energy had previously deployed a grid-connected iron-air installation in Delft, Netherlands, to test integration with existing European grid infrastructure before the Budget Thuis commercial commitment

Why It Matters

If Ore Energy delivers the 1 GWh system on schedule, it would give a European utility a commercially deployed, multi-day iron-air battery for the first time — directly addressing the curtailment-and-fossil-backup problem Yilmaz flags, while sidestepping the critical-mineral supply chain that constrains lithium-ion scaling.

Sources Cited

Related Coverage

The day’s news in one short email, every morning.

Free. One email a day. Unsubscribe in one click.