PJM Urges FERC to Dismiss Mon Power’s $145M Claim

The 30-Second Skim
- What happened: At FERC, Mon Power is seeking relief after Winter Storm Fern as PJM and major generator groups reject a market rerun, while West Virginia officials seek scrutiny of emergency scheduling.
- Key facts & numbers: PJM urged FERC on Monday to dismiss Mon Power’s Oct. 6 complaint seeking $145 million for Winter Storm Fern losses, calling the case “a fishing expedition without substance.” PJM argued that downed power lines on Mon Power’s system were the “most obvious and significant” driver of the locational marginal price differences the utility faced during the storm. Mon Power said PJM advance-scheduled more than 50,000 MW a day of gas-fired units from Jan. 26 through Jan. 31 and more than 45,000 MW on Feb. 1, while dispatching Mon Power’s cheaper coal units at or near economic minimum.
- What happens next: Industry consensus favors market finality; the wrinkle is that even Mon Power’s opponents still blame PJM’s gas-heavy scheduling for distorting markets.
- PJM urged FERC on Monday to dismiss Mon Power’s Oct. 6 complaint seeking $145 million for Winter Storm Fern losses, calling the case “a fishing expedition without substance.”
- PJM argued that downed power lines on Mon Power’s system were the “most obvious and significant” driver of the locational marginal price differences the utility faced during the storm.
- Mon Power said PJM advance-scheduled more than 50,000 MW a day of gas-fired units from Jan. 26 through Jan. 31 and more than 45,000 MW on Feb. 1, while dispatching Mon Power’s cheaper coal units at or near economic minimum.
- Mon Power argued that PJM’s advance scheduling was unnecessary and harmful absent proof that gas units would likely have failed under normal market rules, and called the $145 million loss its largest net expense in its history.
Why It Matters
Mon Power says ordinary West Virginia citizens would bear the $145 million without FERC intervention, while generator groups say a rerun would violate market finality and FERC precedent. The dispute therefore extends beyond one utility’s loss to the settled-market rules governing PJM’s gas-heavy emergency commitments.