Green Water & Power powers up its 10,000th EV charger in just 3 years — SkimNews

Get the Energy newsletter
Daily energy & climate — solar, EVs, oil, the policy fights and tech bets shaping the transition. Free.
- Green Water & Power installed its 10,000th EV charging port in three years, averaging nearly 10 new chargers powered each day nationwide.
- Green Water & Power and Autel began rolling out Level 2 chargers together in 2023, with the 10,000th unit energized earlier this month.
- Autel Energy supplied the hardware and software platform that GWP credits for enabling reliable, scalable deployment across diverse customer sectors.
- Green Water & Power reports its network has delivered 16.6 million kWh to date, displacing over 22,000 metric tons of CO2 emissions.
- Danny Gold, President of Green Water & Power, emphasized that reliability—not just speed of deployment—is central to customer trust and long-term scalability.
- Michelle Luo, CEO of Autel Energy, stated their technology was designed from the outset to meet industry benchmarks for flexibility and dependability at scale.
Why it matters: Green Water & Power’s 99.72% uptime across 10,000 chargers in three years sets a high bar for network reliability in a sector where failed sessions erode driver confidence—making scalable, working infrastructure more valuable than raw port counts alone. This operational performance directly benefits property owners and EV drivers who depend on consistent access.
Ask SkimNews




