San Francisco Launches Citywide Curbside EV Charging Program — SkimNews

Get the Energy newsletter
Daily energy & climate — solar, EVs, oil, the policy fights and tech bets shaping the transition. Free.
- San Francisco launched a citywide curbside EV charging program, enabling charging operators to apply for permits and install public chargers across neighborhoods.
- SFMTA is accepting applications from charging operators and has published a full permit package outlining equipment, maintenance, data reporting, and site requirements.
- Residents can use the new ChargeUp SF map to nominate streets, public facilities, and other locations where they want EV chargers installed.
- Tyrone Jue, director of the San Francisco Environment Department, stated that access to curbside charging determines whether going electric is practical for many city residents.
- Charging companies must qualify for an operator permit and obtain individual site permits for each location, involving utility coordination and neighborhood consultation.
- San Francisco began testing curbside charging in 2025 with two pilot chargers at 55 Fillmore Street, involving companies it’s electric, Urban EV, and Voltpost.
- The city aims to have 100 curbside EV charging stations installed by 2030 as part of its long-term transportation pollution reduction strategy.
Why it matters: Apartment and condo dwellers in San Francisco, who make up the majority of residents and lack private garages, now gain a direct pathway to influence where public EV chargers are built. The 100-station goal by 2030 makes electrification more viable for urban renters, directly linking infrastructure access to cleaner transportation adoption.
Ask SkimNews




